21st Century (2000–present)

Seattle Waterfront Seattle Program

2012– · United States · North America · Post-industrial regeneration and waterfront urbanism · Planned by City of Seattle; James Corner Field Operations
Waterfront Seattle framework plan: the new Alaskan Way promenade with 'folds' and waterfront destinations from Pioneer Square to Belltown after removal of the Alaskan Way Viaduct
Waterfront Seattle framework plan: the new Alaskan Way promenade with 'folds' and waterfront destinations from Pioneer Square to Belltown after removal of the Alaskan Way Viaduct · © City of Seattle — used with credit · City of Seattle / James Corner Field Operations, Waterfront Seattle Design Summary (2012)

Core idea

Viaduct removal and new waterfront park

Why it matters

Global case of freeway removal + waterfront

Description

A public programme, initiated in 2012 by the City of Seattle with James Corner Field Operations as lead designer, to rebuild the central waterfront after the demolition of the elevated Alaskan Way Viaduct, whose traffic was rerouted into a bored highway tunnel. The plan creates a continuous park promenade along Elliott Bay, a rebuilt surface street, new east–west connections such as the Overlook Walk linking Pike Place Market to the water, and rehabilitated piers. The main elements were completed through the early 2020s.

Significance

Waterfront Seattle is one of the most cited contemporary cases of urban freeway removal, demonstrating that a downtown can trade an elevated highway for public space. It figures prominently in international debates on highway teardowns, seismic risk-driven infrastructure renewal and the design of post-industrial waterfronts, while also attracting scrutiny over the cost of the replacement tunnel.

What shaped it

Sources

Open it on the interactive timeline →
hub.toekom.st — History of Urbanism · an interactive timeline of 850 planned cities across 6,000 years.